Next: Bibliography
Up: USER OPERATION AND UPGRADES
Previous: UPGRADES
The FOFB has reached or even exceeded the original design parameters [3] in its 2nd year of user operation at an availability of
98%. It will be extended by at least one DBPM and most probably several XBPMs in the near future. Excellent medium term stability can only be achieved in conjunction with ``top-up'' operation [10].
Michael Boege
2005-05-23